Wellness Breda

Manufacturing Pool

Wellness Breda

Previous Machinefactory building. Built in 1938

Maintaining history by keeping original footprint

Building is structural devided Water not proportional devided around building.

Entrances on both sides of the building. Same as Electron building.

Remembering the history: Facade opening on most impressive parts Removing parts of office building but maintain footprint

After Entrance and Transition zone create one large area

Maintaining History 2: Not complete remove building but keep construction. Outside swimming possible and south protection against sunlight

Cross section shows different sizes of water and buildings. To maintain view on canal southern interior will be lifted up, and northern parts will be kept lower

As water is not proportional divided around the building, Water Tower is more easily visible. Facade openings will be mainly on south because of view on Canal. Create a swimming in an outdoor industrial area

  • ARCHITECTURE TAGNAME : Wellness Breda
  • URBAN DESIGN TAGNAME :
  • ARTICLE TAGNAME :
  • PHOTOGRAPHY TAGNAME :
  • WEB TAGNAME :
  • CALCULATION TAGNAME :